Financial Model Of Viability Gap Fund : Case Study on Palembang - Indralaya Toll Road Project
DOI:
https://doi.org/10.31685/kek.v19i3.142Keywords:
viability gap fund, infrastructure, government support, financial modelAbstract
Inadequate supply of infrastructure is number five of the most problematic factors for doing business in Indonesia. Therefore Government of Indonesia (GoI) continues to accelerate the development of infrastructure either in terms of financing, incentives, and especially through Public Private Partnership (PPP) scheme. One of the breakthroughs made by the government in the PPP scheme is by providing support in the form of cash funds for the construction cost of the project also called Viability Gap Fund (VGF), in order to make a project that was previously financially unviable to become financially viable. This study aims to describe about the possibility of VGF in accelerating infrastructure development through PPP scheme, as well as conduct a financial model to calculate whether VGF really can make a project financially viable with a case study on the Palembang - Indralaya Toll Road Project. Methodology used in this study is quantitative method with the financial analysis. IRR and NPV are used as main financial parameters to determine financial viability of the project. The research shows that VGF will make Palembang-Indralaya Toll Road Project become financially viable.References
Abednego, M. P., & Ogunlana, S. O. (2006). Good Project Governance For Proper Risk Allocation In
Public – Private Partnerships in Indonesia. International Journal of Project Management, 24,
–634. doi:10.1016/j.ijproman.2006.07.010
Antono, E. F. (2009). The Application of Public Private Partnership In Financially Non-Feasible Project
Study Case : Tanjung Priok Access Toll Road Project, Indonesia.
Asian Development Bank. (2008). Public-Private Partnership Handbook.
Chen, B. L., Liou, F. M., & Huang, C. P. (2012). Optimal Financing Mix of Financially Non-Viable
Private-Participation Investment Project with Initial Subsidy. Inzinerine Ekonomika-
Engineering Economics, 23(5), 452–461. doi:10.5755/j01.ee.23.5.3130
Damayanty, S. A., & Setiawan, H. (2012). Public - Private Partnership in Indonesia Infrastructure
Development: Policy Background, Progress and Prospect. In Proceeding on The 11th
International Conference of the Japan Economic Policy Association.
Damayanty, S. A., & Setiawan, H. (2013). Aspek Perpajakan Viability Gap Fund. Warta Fiskal Edisi 5,
–29.
Kementerian Keuangan. (2012). Peraturan Menteri Keuangan Nomor 223/PMK.11/2012 tentang
Pemberian Dukungan Kelayakan Atas Sebagian Biaya Konstruksi Pada Proyek Kerja Sama
Pemerintah Dengan Badan Usaha Dalam Penyediaan Infrastruktur.
Kumaraswamy, M. M., & Zhang, X. Q. (2001). Governmental role in BOT-led Infrastructure
Development. International Journal of Project Management, 19, 195–205.
OECD. (2013). Green Growth in Cities. OECD Publishing. doi:10.1787/9789264195325-en
Republik Indonesia. (2015). Perpres Nomor 38 Tahun 2015 tentang Kerjasama Pemerintah dengan
Badan Usaha Dalam penyediaan Infrastruktur.
RiskAMP. (2012). What is Monte Carlo Simulation ? Retrieved June 1, 2015, from
https://www.riskamp.com/files/RiskAMP - Monte Carlo Simulation.pdf
Schwab, K. (2014). The Global Competitiveness Report 2014-2015.
Setiawan, H., & Damayanty, S. A. (2012). Belajar VGF ke India. Info Risiko Fiskal Edisi 1, 9–11.
Tsukada, S. (2005). Global Experiences of Public Private Partnership for Highway Development.
Retrieved June 10, 2015, from
http://www.apu.ac.jp/rcaps/uploads/fckeditor/publications/journal/RJAPS_V25_Tsukada.pdf
Wirahadikusumah, R. D., Sapitri, S., Susanti, B., & Soemardi, B. (2014). Risk Inclusion in the Reserve
Price Estimation for Toll Road Concession Award. Journal of Traffic and Logistics Engineering,
(1), 34–39. doi:10.12720/jtle.2.1.34-39
World Bank. (2014). 2014 Global PPI Update. Retrieved from
http://ppi.worldbank.org/~/media/GIAWB/PPI/Documents/Global-Notes/Global2014-PPIUpdate.
World Bank, Asian Development Bank, & Inter-American Development Bank. (2014). Public-Private
Partnerships Reference Guide Version 2.0.
Yuanda, Y., & Haneman, A. (2008). Teknik sipil. Media Komunikasi Teknik Sipil, 2(88), 171–187.
Downloads
Published
Issue
Section
License
STATEMENT OF AUTHENTICITY AND COPYRIGHT RELEASE
I hereby certify that:
- The article (Article title) is authentic and never being published previously or will be published in other publication as well as not a plagiarism in any form.
- The article does not have any issue with other parties, regarding of the publication copyright.
- All the authors have read this statement and agree with the name and sequence.
- Hereby, I transfer the copyright of my article (Article title) to the KEK Editorial Board . this copyright transfer includes a right to reproduce a photograph for the similar article and its translation. This is also including a right to upload the article into a computer system which disseminated widely on the internet.
- Hereby, I agree with my article (Article title) to be published by KEK Volume (xx) Edition (x), under Creative Common Attribution- NonCommercial-ShareAlike 4.0 licensing. This is also including a right to upload the article into a computer system which disseminated widely on the internet.
Name : (Full Name)
Date : (Signing date)